In the process of home decoration, if the floor adopts wood floor, it should generally be carried out according to the following construction procedures:

in the process of home decoration, if the floor adopts wood floor, it should generally be carried out according to the following construction procedures:

Booky door solid wood composite floor

(1) make the ground flat, clean and dry, and brush twice with waterproof paint

(2) directly lay the wooden frame (commonly known as wooden joist) according to the snapping line on the ground. The cross-sectional dimension of the wooden frame is 3omm′ 40mm or 4ommm′ 50mm, the connection method is half groove buckle, and glue and nail are applied at the buckle. Then drill holes in the wooden frame and the ground with an impact drill, fix it with the ground with bolts, and check whether the frame is horizontal

(3) nail the base plate on the wood frame. The base plate can be made of thick plywood or thick wooden strips, and the edge of the plywood and the end of the wooden strip are all needle on the center line of the wood frame

(4) determine the floor jigsaw and snap lines according to the size of each floor and the area of the room, usually including square format, herringbone pattern, step pattern, etc

(5) try to pave according to the snapping line, with the core of the board facing up, the sapwood facing down, and the width between the boards is not greater than 1mm. After repeated adjustment, it shall be numbered. During construction, it shall be paved around the middle of the numbered living room. When it is paved to the foot of the wall, a board wide space should be left, and wood blocks should be stuffed into the space to support the water floor. Tighten the wooden wedge of the top block at the beginning to drain the floor tightly

(6) smash the head with a round nail with a length of 2 ~ 2.5 times the thickness of the board, and nail it obliquely from the concave corner of the board. If it is a hardwood, use an electric hand drill to drill a hole with a diameter smaller than the round nail obliquely to prevent the needle from cracking the wood floor

(7) after cleaning the ground, first plan roughly according to the vertical grain, then plan carefully according to the direction of grain, and then polish. The total thickness of planing and grinding shall not exceed 1.5mm

(8) remove the top tightening blocks around the ground and carry out floor edging. Long wooden strips or wooden floor strips can be used for edging

(9) paint after the floor is polished, and wax after it is completely dry

key points of Construction:

① the wooden frame must be kept horizontal after being fixed on the ground

② when laying, try to squeeze the adjacent wooden floor to make it tight and seamless, and the height difference with the adjacent water floor shall not exceed ± 1.5mm, and pay attention to the edge of the floor